Before you choose where an ADU will go, find out what is buried under the yard. That means contacting 811, the free national call-before-you-dig number, to have public utility lines marked, and separately locating the private lines 811 usually does not mark, such as sewer laterals, irrigation, and lines running to garages, pools or outbuildings. Doing this at the planning stage, not the night before excavation, keeps the footprint off lines that are expensive to move.
Here is how an experienced ADU builder approaches ADU utility locating, and what to have mapped before a design is drawn.
Why ADU utility locating belongs in planning, not just digging
Most people think of utility marks as a safety step for the excavator. They are, but for an ADU they are also a design input. A buried line can decide:
- Where the footprint can go. Building over a gas, sewer or electrical line may be prohibited, may require relocation or may put the line inside an easement the utility controls.
- How new services reach the ADU. Water, sewer, power and communications usually run from the main house or the street to the new unit. Existing lines shape the trench route.
- What the budget needs to carry. Relocating a line is a real cost, and finding it after permits are issued can force a redesign.
On the ADUs we build, a rough locate of what is in the yard comes before the footprint is finalized, because moving a box on paper is free and moving a pipe is not.
What 811 marks and what it does not
811 routes your request to the one-call center for your state or region. That center notifies its member utilities, which send locators to mark their lines with paint or flags. The service is free to the homeowner.
What 811 typically covers:
- Lines owned by member utilities, such as gas mains and service lines up to the meter, electric service, phone, cable and fiber, and public water or sewer mains
What 811 often does not cover:
- Private lines past the meter. Power to a detached garage or shop, a gas line to a grill or pool heater, and water lines to hose bibs or outbuildings usually belong to the property owner.
- Sewer laterals. The pipe from the house to the public sewer is often the owner's responsibility and may not be marked.
- Septic systems. Tanks, distribution boxes and drain fields are private.
- Irrigation, low-voltage lighting and drainage pipes.
- Propane tanks and their lines, and private wells.
Which lines a utility marks, how long you must wait for marks and how long they stay valid are set by state law and center rules, so specific rules vary by jurisdiction. Check your state's one-call center for details.
Planning-stage requests and why timing matters
811 is designed around upcoming excavation, so a standard request is usually tied to a planned dig date. Some one-call centers offer a separate design or planning request intended for projects still being designed. Others do not. Ask your center which request type fits an ADU that is still on paper.
Keep in mind that marks are temporary. Paint fades, flags get mowed and marks may expire after a set period. If you locate early for planning, expect to request a new locate before excavation begins. Photograph the marks with a tape measure in frame and note distances from fixed points such as house corners, so the information survives after the paint is gone.
Locating private lines on your property
For the lines 811 will not mark, owners usually combine records with a private locate:
- Private utility locating services use electromagnetic locators on metallic lines and tracer wire, and sometimes ground-penetrating radar for non-metallic pipe. Results depend on soil, depth and pipe material.
- Sewer camera inspection with a locating transmitter can trace the sewer lateral and check its condition at the same time, which matters if the ADU will tie into it.
- Records such as old permits, as-built drawings, septic records from the county or health department, and notes from previous owners can show what was installed and where.
None of these methods is perfect. Treat the results as the best available information and plan some margin around each line.
The Age-in-Place ADU Guide
Design a home around the life your parent wants to keep, build it so it holds up as needs change, and pay no more than it should cost.
Reading the marks: the color code
Locators use a standard color code, so you can tell what each mark means:
- Red: electric power
- Yellow: gas, oil or steam
- Orange: communications, such as phone, cable and fiber
- Blue: potable water
- Green: sewer and drain lines
- Purple: reclaimed water and irrigation
- Pink: temporary survey markings
- White: proposed excavation area
Marks show the approximate location, not the exact depth. State law usually defines a tolerance zone on each side of a mark where only careful hand digging or other non-destructive methods are allowed. The width of that zone varies by state.
Putting the results on your site plan
Once lines are marked, get them onto paper:
- Sketch every marked line with measurements to house corners and property lines.
- Add private lines from the private locate and records.
- Overlay the ADU footprint options and see which ones cross or crowd existing lines.
- Plan new service routes from the main house or street to the ADU, avoiding conflicts. Some jurisdictions set minimum separations between water and sewer lines in a trench, so confirm the local rules.
- Share the map with your designer and surveyor so it can be reflected in the site plan.
A free ADU lot check can help you see your parcel and rough buildable area before you start sketching. Our guide to ADU easements and surveys explains how recorded easements, which often follow utility lines, can limit where you build.
Utility conflicts and what they can cost
If a line sits where the ADU needs to go, the usual options are to shift the footprint, relocate the line or, in limited cases, build over it with the utility's or building department's approval. Relocation costs vary widely with the type of line, its depth, the distance and who must do the work. Gas and electric relocations are often handled or approved by the utility itself, which adds lead time.
This is also the point to check capacity, not just location. An existing line in the right place may still be too small for an added home. Our guides to ADU sewer connections and electrical panel upgrades cover those questions. If you are building to rent, include any relocation cost in your numbers with the ADU ROI calculator.