ADU rules by zoning district

This area holds parcels in 2 jurisdictions, and the ADU rules differ between them. The lot check reads the county parcel record to tell you which one your lot is in; both codes are below.

City of Grand Junction

Setbacks for a detached ADU, the size limit and maximum lot coverage, read from the published code on 2026-10-12. The lot check applies the row for your parcel’s district.

DistrictADU allowedFrontSideRearLot coverage
R-R
Residential - Rural
Yes25 ft50 ft50 ft5%
R-ER
Residential - Estate Retired
Yes25 ft5 ft10 ft15%
R-1R
Residential 1 Retired
Yes25 ft3 ft10 ft20%
R-2R
Residential 2 Retired
Yes25 ft3 ft5 ft30%
RL-4
Residential Low 4
Yes25 ft3 ft5 ft50%
RL-5
Residential Low 5
Yes25 ft3 ft5 ft60%
RM-8
Residential Medium 8
Yes25 ft3 ft5 ft75%
RM-12
Residential Medium 12
Yes25 ft3 ft5 ft75%
RH-16
Residential High 16
Yes25 ft3 ft5 ft75%
RH-24
Residential High 24
Yes25 ft3 ft5 ft80%

Size limit: 900 sq ft of habitable space; not gross floor area.

Sources: ecode360.com

Unincorporated Mesa County

Setbacks for a detached ADU, the size limit and maximum lot coverage, read from the published code on 2026-10-12. The lot check applies the row for your parcel’s district.

DistrictADU allowedFrontSideRearLot coverage
AF-35
Agricultural and Forestry District
Yes50 ft50 ft50 ft—
AFT
Agricultural, Forestry, Transitional District
Yes50 ft10 ft30 ft—
RSF-R
Residential Single Family - Rural District
Yes50 ft10 ft30 ft—
RSF-E
Residential Single Family - Estate District
Yes20 ft15 ft25 ft25%
URR
Urban Residential Reserve District
Yes20 ft15 ft25 ft50%
RSF-1
Residential Single Family - 1 District
Yes20 ft15 ft30 ft20%
RSF-2
Residential Single Family - 2 District
Yes20 ft15 ft30 ft30%
RSF-4
Residential Single Family - 4 District
Yes20 ft7 ft20 ft50%
RMF-5
Residential Multi Family - 5 District
Yes20 ft5 ft15 ft60%
RMF-8
Residential Multi Family - 8 District
Yes20 ft5 ft10 ft70%
RMF-12
Residential Multi Family - 12 District
No20 ft5 ft10 ft75%
RMF-16
Residential Multi-Family - 16 District
No20 ft5 ft10 ft75%
RMF-24
Residential Multi-Family - 24 District
No20 ft5 ft10 ft80%

Size limit: By lot size, heated living area: <1/2 ac 900; >1/2 ac and <1 ac 1,200; >=1 ac greater of 1,500 or 50% of principal heated living area. District min lot is 35 acres, so the >=1 acre tier normally applies.

Sources: www.mesacounty.us

Questions people ask

Is the Redlands in the City of Grand Junction or Mesa County?

Both. The Redlands is not a separate town; it is a named area west of the Colorado River that contains City of Grand Junction parcels and unincorporated Mesa County parcels side by side. A Grand Junction mailing address does not settle it, and neither does the school or fire district. The county parcel record does, which is what the lot check reads.

Why does it matter which one I am in?

Because the ADU rules are not the same. In the city the ADU is capped at 900 square feet of habitable space and uses the small accessory-building setbacks — typically 3 feet from the side and 5 feet from the rear. In unincorporated Mesa County the cap scales with the lot, up to 1,500 square feet or half the house on an acre or more, but the ADU currently has to meet the full main-house setbacks and one off-street space per bedroom.

Which is better for an ADU, the city side or the county side?

It depends on the lot. On a typical quarter-acre city lot the small accessory setbacks leave far more usable back yard, so the city side usually wins. On a one-acre county lot the larger size cap matters more than the setbacks, because there is room to meet them. The lot check draws the buildable area for your parcel either way, which is the only answer that counts.

Do large Redlands lots have different rules?

Yes. Large-lot districts carry much deeper setbacks — in the city’s R-R district a detached ADU sits 50 feet off the front line. Lots on septic add a second constraint, because the county allows one septic system per parcel and a second dwelling has to be accounted for in the system’s capacity.

Does the Redlands have slope or drainage issues for an ADU?

Parts of it do. Ground near the base of the Monument and along the ridges can be steep enough to change the foundation design, and the soils on the valley floor vary over short distances. Neither is visible on a map. A soils report before the foundation is priced is the step that protects the budget.

Nearby